Kitchenette, DJ booth, Windows & Concrete.
Here we have the kitchenette being built and the second floor being framed for the DJ to run sound from the top.
Starting to install the railing for stairs and handicap ramp.
Sprayed the windows with a milk glass blue and cream to lighten the background. There is a fire wall with brown insulation all along the back of this wall to help keep out sound from the two apartments on the other side.
Last section of the concrete was poured.