Alley Way & Stairs
We got the stairs installed today. Aircraft cables will run through the sides and railing all along the mezzanine.
Alley has been striped of old asphalt and new concrete poured up to the new sidewalks. The sidewalks will extend all the way to the corner of the Cafe on Broadway.